![logo](https://gouldconstruction.com/wp-content/uploads/2020/04/GouldHeaderLogo_dark.png)
The Devereux Pedestrian Bridge project was constructed to get pedestrians safely over Interstate 70. Gould Construction crews constructed 5,532 SF of Keystone MSE retaining walls. Four concrete abutments a top steel piling were constructed to accept a 124 foot bridge in Two Rivers Park and a 206 foot bridge over I-70.
LocationGlenwood SpringsOwnerCity of Glenwood SpringsEngineerLoris & Associates