Project included three prefabricated bridges across the UPRR tracks, I-70 and the Colorado River. Project also includes an eight foot wide pedestrian/bicycle trail connecting the bridges to the Highway 6 corridor and the CR 335 corridor.
LocationNew Castle, COOwnerTown of New CastleEngineerSGM