This project features two primary components, which includes a 390-foot long pedestrian and utility bridge spanning the Colorado River and approximately 4,000 linear feet of 30-inch gravity sewer line. The bridge structure consists of three prefabricated superstructure truss units supported by cast-in-place concrete piers and abutments. Utilities on the bridge include a 30-inch diameter sanitary sewer pipe with an allotment of two, 20-inch utility pipes in the future. The depth of the gravity line ranges from 5 feet to 30 feet below ground surface.
LocationClifton, COOwnerMesa County Whitewater Public Improvements DistrictEngineerJacobs Engineering