Location: Snowmass Village, CO Owner: Town of Snowmass Village
Engineer: SGM
Completion: 2024
Project Highlights
-Removed damaged 60" CMP pipe and created an open channel with rock for the water to flow down properly.
-Built a headwall out of boulders.
-Restored the areas where the water had created side channels back to the beautiful hillside it had been prior.
-Built a bridge crossing the open channel to maintain pedestrian traffic on the existing trails that cut through the hillside.
- Filled voids between the rocks with flow fill & concrete.
-Performed revegetation including topsoiling.