Location: New Castle, CO
Owner: Town of New Castle
Engineer: SGM Engineering
Completion: 2014
Award: American Public Works Association
Project Highlights
-Included three prefabricated bridges across the UPRR tracks, I-70 and the Colorado River.
-Constructed an eight foot wide pedestrian/bicycle trail connecting the bridges to the Highway 6 corridor and the CR 335 corridor.