Location: Aspen, CO
Owner: City of Aspen Parks and Open Space
Engineer: OTAK
Completion: 2024
Project Highlights
-Construction of 5,245 linear feet of ADA-accessible multi-use trail to connect the Colorado Highway 82 roundabout to the Aspen Recreation Center and beyond.
-Realigned a section of the existing timber pedestrian bridge adjacent to the Aspen Recreation Center (ARC).
-Construction of over 7300 S.F. of Redi-Rock retaining walls.
-Installation of multiple storm water collection and detention structures.
-Relocation of multiple utilities and improvements to adjacent side street intersections.