Location: Gypsum, CO
Owner: Costco Wholesale
Engineer: Kier and Wright
Completion: 2006
Project Highlights
-Gould Construction performed the site work for Costco Wholesale in Gypsum.
-Approximately 80,000 cy of dirt was moved on the project.
-The building pad was over excavated 8 feet, geogrid placed, and the soil processed and filled back to pad elevation due to poor soils.
-Installed water and sewer mains.
-Constructed approximately 10 acres of parking lot and an associated drainage system.