STREETSCAPES AND TRAILS 

Eagle Valley Trail Segment I

Share:

Project Overview

Location: Eagle/Vail, CO
Owner: Eagle County
Engineer: OTAK
Completion: 2023

Project Highlights

-Installed 2600 ft of new trail just east of Eagle-Vail.
-Lengthened an existing retaining wall, a couple storm drain lines and new 10ft sidewalk with new type 7 concrete barrier for the full length of the trail.
-Installed new pedestrian railing on the river side of the trail.
-Kayak Court Bus hub redone with new plaza area flatwork, C&T and asphalt.